Photo Gallery

Runway construction

An E-4B takes off from the runway here and flies over Building D May 7, 2020. The Air Force Civil Engineer Center has awarded a $143.9 million contract to replace the runway here. During the two-year project, the 55th Wing’s fleet will conduct flight operations out of Lincoln Airport, roughly 50 miles away. The project will reconstruct the original runway infrastructure, built in 1941, to include full-depth concrete end sections, an asphalt center section, and asphalt shoulders as well as installation of new lighting systems.

PHOTO BY: Tech. Sgt. William A. O'Brien
VIRIN: 200507-F-OH250-1555.JPG
FULL SIZE: 5.44 MB
Additional Details

CAMERA

NIKON D810

LENS

24.0-70.0 mm f/2.8

APERTURE

8

SHUTTERSPEED

1/3200

ISO

800

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.