ICBM Logistics and Planning
ICBMs have received the new Transporter Erector Replacement Program (TERP) and the Payload Transporter Replacement (PTR) vehicles that move a booster, Post Boost Control System (PBCS), and Re-entry System (RS) to facilitate MMIII missile movements. What are the logistic supply/support chains to maintain these key vehicles to last beyond 2050 and what considerations need to be made?