455 ELRS and 455 ECS drastically reduce check-in times at PAX terminal
Tech. Sgt. Timothy Abiera, 455th Expeditionary Logistics Readiness Squadron contracting officer representative, demonstrates how the new process of checking in passengers at the passenger terminal will work Jan. 19, 2018 at Bagram Airfield, Afghanistan. Abiera was one of two Bagram Airfield Airmen that revamped the old process to decrease the wait time and save the Airmen of the 455th Air Expeditionary Wing’s time. (U.S. Air Force photo/Tech. Sgt. Justin Jacobs)
PHOTO BY:
Tech. Sgt. Justin Jacobs
VIRIN:
180119-F-WB400-001.JPG
FULL SIZE:
1.07 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.